Nov 2001
Works superintendent for Kingston Projects and Environmental Responsible for many projects including Theiss Alstrom fastrail,Martha cove, looked after several projects simultaneously at various times Inclusive of environmental management of many sites including asbestos, petrochemical and heavy metal recovery last job basement excavation in St Kilda completion 22-march 2006Reference Dr Collette Burke 0411043167

June2001 – Nov 2001
Hallam Bypass Section 1 & 2 Project Value 78 million
Supervisor of earthworks.
Reference Tony Carecos 0412 335 905

April 2001 – June 2001
Dynon/Footscray Road
With Standard Roads – Project Value 2 million-
Duties were as earthworks, drainage, and pavement supervisor.
Reference Dominic Defazio 0417053176

April 2000 – April 2001
Duplication Of Narre Warren North Road with Standard Roads – Project Value 7.4 million – Profit margin 1 million Duties were as a supervisor on earthworks, bridge abutments, drainage and services Reference Tony Caracos.

October 1999 – April 2001
Western Ring Road – Abigroup Contractors Supervisor on bridge abutment and road pavement. Reference Greg Vincent

November 1996 – October 1999
Worked for Transfield ObayashiAs a supervisor. Works included coffer dam excavation on both sides of the Yarra River, the cut and cover section of the Burnley Tunnel and landscaping, road barriers and pavement on the South Eastern Freeway. Reference Jason Speers.

June 1991 – November 1996
Foreman and Plant Operator for Andy’s Earthmovers nee Paradise, Resources. Work included basic earthworks on various machinery, working unsupervised on various Projects, machine maintenance and repairs. Have successfully quoted supervised and completed a number of projects. Have been hired out as a works supervisor to Lugerzone Pty Ltd., Transfield Obayashi, and Global Shaping Pty Ltd.

November 1988 To June 1991
Began Brock Constructions Civil Earthworks and Demolition Co. Works consisted of demolition and earthworks of Caulfield race course grand stand project, demolition and deep basement excavations for high rise commercial property developments, in Deepdene, Glen Iris, and Box Hill. Along with cut to fill projects, some highway works hire and other minor projects.

September 1987 To November 1988
Worked for Big Cat Plant Hire as earthworks supervisor. Work included managing earthworks machinery, personnel and projects.

December 1986 To September 1987
Owner/operator of John Deere 570 Grader. Final trim roadwork’s and hire for various companies/plant hire agencies.

December 1984 To December 1986
Graduated from Fairfield Infectious Diseases Hospital as State Enrolled Nurse and worked as agency staff and part time plant operator for Various earthmoving companies.

1983-1984
Trained as an S.E.N. at Fairfield whilst doing some night shift work for Hoare Brothers Earthmoving.

1972 – 1983
Began work as a plant operator on dozers, scrapers, front loaders, graders and other machinery as available in Twizel – N.Z.Started in-service training as a surveyor, developing basic plan reading and surveying skills with the Ministry of Works, NZ. Resumed work as a plant operator and spent sometime training operators.

Arrived in Australia, Nov 1979.
Worked for various earth moving companies throughout Australia, as a plant operator, leading hand and foreman. Companies include Twigg earthmoving, Iraqi Industries in Weipa, Theiss in Loy Yang Victoria, Leighton Contracting at Jabiru uranium mine NT, Teutonic Bore copper mine WA, Substation works at Geelong Victoria And Mt Waverly Police Academy.Cooks Construction at Mudgee Highway relocation NSW and Hastings Marina Vic.